Welcome Guest Search | Active Topics | Log In | Register

VW Samba T1 Official Build Diary - Pack 5 Options
delboy271155
#1 Posted : 27 August 2019 14:22:23

Rank: Super-Elite

Build-Diary Medal: Build-Diary Medal of HonourPublisher Medal: Article published MedalActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsRed Medal: Red MedalTurquoise Medal: Turquoise Medal for model making know-how contribution
Groups: Registered, Administrators, Global Forum Support Team, Moderator, Official Builds

Joined: 09/11/2012
Posts: 6,312
Points: 18,782
Location: East midlands
Stage 36

Cab Rear Panel

Parts supplied:
Cab rear panel, Screws BP06.


Retrieve the cabin assembly and unused parts from stage 35.

Line up the pins of the handle with the holes in the bulkhead and press the pins into the holes. Now locate the three holes in the top of the spare wheel housing and note that they correspond with the two pins and hole in the ashtray, which means it will only fit in one way. Next place the ashtray into position and secure it with a BP07 screw from the inside of the housing.

Locate the two posts and two notches on the bulkhead and the two posts and two tabs on the spare wheel housing. Now place the spare wheel housing against the front bulkhead and press the spare wheel housing against the bulkhead aligning the posts of both parts.


Stage complete, carefully store any remaining parts in a stage labelled bag.

delboy271155 attached the following image(s):
1.JPG
2.JPG
3.JPG
4.JPG
5.JPG
6.JPG
7.JPG
8.JPG
9.JPG
COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"






delboy271155
#2 Posted : 17 November 2019 15:19:07

Rank: Super-Elite

Build-Diary Medal: Build-Diary Medal of HonourPublisher Medal: Article published MedalActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsRed Medal: Red MedalTurquoise Medal: Turquoise Medal for model making know-how contribution
Groups: Registered, Administrators, Global Forum Support Team, Moderator, Official Builds

Joined: 09/11/2012
Posts: 6,312
Points: 18,782
Location: East midlands
Stage 37

Front Floor

Parts supplied:
Front floor, Screws BP06.

Collect together the cab rear panel and the BP06 screws from Stage 36.

Now insert the three posts on the underside of the panel into the corresponding holes in the cab floor and secure the panel with three BP06 screws, checking that the parts are flush as you tighten the screws.

Next align the holes in the front floor with those at the front of the cab floor and press the two parts of the floor together, then secure the parts with five BP06 screws.

Stage complete, carefully store any remaining parts in a stage labelled bag.

delboy271155 attached the following image(s):
1.JPG
2.JPG
3.JPG
4.JPG
5.JPG
6.JPG
7.JPG
8.JPG
9.JPG
COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"






delboy271155
#3 Posted : 17 November 2019 15:23:46

Rank: Super-Elite

Build-Diary Medal: Build-Diary Medal of HonourPublisher Medal: Article published MedalActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsRed Medal: Red MedalTurquoise Medal: Turquoise Medal for model making know-how contribution
Groups: Registered, Administrators, Global Forum Support Team, Moderator, Official Builds

Joined: 09/11/2012
Posts: 6,312
Points: 18,782
Location: East midlands
Stage 38

Front Floor Carpet

Parts supplied:
Front floor carpet. Accelerator cable (01), Brake cable (02), Gear lever, Handbrake lever, Accelerator pedal, Clutch pedal, Brake pedal, Accelerator plate, Brake plate, Pins, Starter knob, Heating knob, Heating controller, Screw BP06 and BP08.

Place the posts on the underside of the front seat floor carpet into the holes in the front floor and press the carpet into place.

Insert the accelerator pedal into position in the front floor, then turn the assembly over and insert a pin through the aligned holes (smooth end first) and using a pair of pliers press the pin into the hole.

Next insert the brake pedal into the front floor and fix it in place in the same way as the accelerator pedal with a second pin.

Now insert the clutch pedal into the front floor noting that the clutch pedal is not secured from underneath, so check that it is properly positioned.

Stage complete, carefully store any remaining parts in a stage labelled bag.


delboy271155 attached the following image(s):
1.JPG
2.JPG
3.JPG
4.JPG
5.JPG
6.JPG
7.JPG
8.JPG
9.JPG
10.JPG
11.JPG
12.JPG
13.JPG
COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"






Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF | YAF © 2003-2009, Yet Another Forum.NET
This page was generated in 0.116 seconds.
DeAgostini